“DOSTYK” APARTMENT BUILDING
  • 01
  • /
CUSTOMER “AKKB “ZHANA KURYLYS” LLP
LOCATION NUR-SULTAN CITY, K. SATPAYEV STR., 23
POSITION PRINCIPAL CONTRACTOR
CLASS OF WORK MOUNTING VENTILATED FACADE
COMPLETION SCHEDULE Q4 2009 – Q2 2010
TOTAL BUILDING’S AREA 21 348 M²
MEDIA CENTER BUILDING OF JSC “REPUBLIC TV AND RADIO CORPORATION «KAZAKHSTAN” LOCATED IN ALMATY CITY ON ZHELTOKSAN STREET, 175
  • 01
  • /
CUSTOMER “BUILDING’S ADMINISTRATION OF ALMATY CITY” MGO
POSITION PRINCIPAL CONTRACTOR
CLASS OF WORK DEMOLITION OF THE OLD BUILDING AND TURN-KEY CONSTRUCTION EXCLUDING UTILITY NETWORKS
COMPLETION SCHEDULE Q4 2022 – Q2 2024
ENCLOSURE IN THE ARCHITECTURAL STYLE OF THE MIDDLE AGES OF THE NATIONAL PARK "BOZOK", LOCATED IN THE NORTH OF THE "ILYINKA" RESIDENTIAL AREA OF ASTANA CITY
  • 01
  • /
CUSTOMER STATE HISTORICAL AND CULTURAL MUSEUM "BOZOK" OF THE COMMITTEE OF CULTURE OF THE MINISTRY OF CULTURE AND SPORTS OF THE REPUBLIC OF KAZAKHSTAN
POSITION PRINCIPAL CONTRACTOR
CLASS OF WORK TURN-KEY CONSTRUCTION INCLUDING UTILITY NETWORKS
COMPLETION SCHEDULE Q3 2022 – Q4 2023
SCHOOL FOR 1200 STUDENTS, LOCATED IN THE VILLAGE OF KABANBAY BATYR IN TSELINOGRAD DISTRICT OF AKMOLA REGION
  • 01
  • /
CUSTOMER “SAMRUK-KAZYNA CONSTRUCTION” JSC
POSITION PRINCIPAL CONTRACTOR
CLASS OF WORK TURN-KEY CONSTRUCTION INCLUDING UTILITY NETWORKS
COMPLETION SCHEDULE Q2 2023 – Q4 2024
SCHOOL FOR 1200 STUDENTS, LOCATED IN THE VILLAGE OF KARAZHAR IN TSELINOGRAD DISTRICT OF AKMOLA REGION
  • 01
  • /
CUSTOMER “SAMRUK-KAZYNA CONSTRUCTION” JSC
POSITION PRINCIPAL CONTRACTOR
CLASS OF WORK TURN-KEY CONSTRUCTION INCLUDING UTILITY NETWORKS
COMPLETION SCHEDULE Q2 2023 – Q4 2024
SCHOOL, LOCATED IN THE RESIDENTIAL AREA “BAUYIRLASTAR-3” IN AKTOBE CITY
  • 01
  • /
CUSTOMER “SAMRUK-KAZYNA CONSTRUCTION” JSC
POSITION PRINCIPAL CONTRACTOR
CLASS OF WORK TURN-KEY CONSTRUCTION EXCLUDING UTILITY NETWORKS
COMPLETION SCHEDULE Q3 2023 – Q4 2024
APARTMENT COMPLEX WITH OFFICES AND PARKING LOCATED IN ASTANA CITY IN THE AREA OF STREETS WITH PROJECT NAME Е16, Е32 AND E44
  • 01
  • /
CUSTOMER “BUILDING’S ADMINISTRATION OF NUR-SULTAN CITY” GO
POSITION PRINCIPAL CONTRACTOR
CLASS OF WORK TURN-KEY CONSTRUCTION EXCLUDING UTILITY NETWORKS
COMPLETION SCHEDULE Q1 2022 – Q3 2023
APARTMENT COMPLEX WITH OFFICES, LOCATED IN ASTANA CITY IN THE AREA OF KENESARY AND YANUSHKEVICH STREETS
  • 01
  • /
CUSTOMER “ELORDA DAMU” LLP
POSITION PRINCIPAL CONTRACTOR
CLASS OF WORK TURN-KEY CONSTRUCTION EXCLUDING UTILITY NETWORKS
COMPLETION SCHEDULE Q1 2023 – Q4 2024
APARTMENT BLOCK (69 APARTMENTS) FOR DIPLOMATS
  • 01
  • /
CUSTOMER “AKTEREK LTD” LLP
LOCATION NUR-SULTAN CITY, D. KUNAYEV STREET, 29
POSITION PRINCIPAL CONTRACTOR
CLASS OF WORK SHELL AND CORE CONSTRUCTION
COMPLETION SCHEDULE Q3 2005 – Q1 2007
TOTAL BUILDING’S AREA 24 330,3 M²
“DIPLOMAT” HOTEL AND BUSINESS CENTER
  • 01
  • /
CUSTOMER “AKTEREK LTD” LLP
LOCATION NUR-SULTAN CITY, D. KUNAYEV STREET, 29/1
POSITION PRINCIPAL CONTRACTOR
CLASS OF WORK TURN-KEY CONSTRUCTION
COMPLETION SCHEDULE Q2 2006 – Q3 2008
TOTAL BUILDING’S AREA 22 056 M²
“KHAN SHATYR” SHOPPING AND ENTERTAINMENT CENTER
  • 01
  • /
CUSTOMER BRANCH OF JSC “SEMBOL ULUSLARARASI YATIRIM TARIM PEYZAJ İNŞAAT TURİZM SANAYİ VE TİCARET”
LOCATION NUR-SULTAN CITY, TURAN AVENUE, 37
POSITION SUBCONTRACTOR
CLASS OF WORK CONSTRUCTION OF THE REINFORCED CONCRETE FRAMING
COMPLETION SCHEDULE Q4 2006 - Q4 2008
TOTAL BUILDING’S AREA 100 000 M²